From projectdetails to a firstTA-plan, faster
A structured workflow for TA plans, permit materials, review, and revisions.
Apply for pilot accessPilot access for selected contractor teams in Sweden.
Project intake
- Project
- Fiber maintenance
- Location
- Gothenburg
- Work type
- Utility maintenance
- Start
- 12 May 2025
- Duration
- 5 days
- Traffic impact
- Lane reduction

Municipality review
Gothenburg City
Plan draft
First version generated

Review & export with human oversight
Human review required before export
Bring the whole TA-plan workflow into one case
Project details, location context, permit materials, draft plans, review notes, and revisions stay connected from the start.
From: project@entreprenad.se
TA-plan for roadwork
TA-plan_v2.pdf
2.4 MB

Strandvägen 12
411 07 Gothenburg
Gothenburg City
Traffic Office
Observe existing bus stop moved temporarily.
Work description.docx
1.1 MB
Contact
Karin Lund
070-123 45 67

Existing conditions.jpg
2.7 MB
Erik J.
Yesterday 14:32Review the pedestrian crossing here, the sign line is limited.
Case · HV-2405-0187
Strandvägen 12, Gothenburg
Karin Lund
Owner
Intake
Project details • Contacts • Work type
Location
Address • Map context • Site photos
Draft
TA-plan draft • Drawings • Signage plan
Checks
Internal checks • Requirements • Risk note
Review
Municipality review • Comments • Request for info
Revision history
Version overview • Change log • Comments
Everything stays connected in one place.
From first intake to latest revision.
Case handling around the plan
The TA plan is only part of the case
Harvado keeps requirements, authorities, documents, statuses, and follow-up tasks connected to the same workflow.
See which authority steps apply
Track required documents and attachments
Know what has been sent and what is waiting
Keep follow-up tasks connected to the case
Case overview
In progressMunicipality requirements
CompletedPolice permit
WaitingExcavation / public space
Not neededAttachments
3 / 4 readyFollow-up
Provide traffic planShape the pilot with us
We are looking for contractor-side teams with recurring TA-plan and street-work workflows.
Apply for pilot access